Thebasic supply of electricity requires a dense and flexiblepower cable network. However, the high material and financial expenditure for laying cables using open trench methods often prevents the electricity from getting to where it is needed. The solution is the ecologically and economically gentle NODIG construction method. With trenchless technologies, underground cable routing is possible practically everywhere: in complex urban areas or across country, in protected areas or even underwater.

Laying underground cables is safe, simple and environmentally friendly

With our NODIG systems you can install the protection pipes for medium and high-voltage underground electric cables over long distances just as easily and environmentally friendly as the service lines to the end user, even directly into the supply room. By laying earth cables without trenches, you can even realise projects that would otherwise not be feasible for nature conservation reasons or because of concerned residents. Innovative NODIG technologies and proven standards make underground cable installation easier than you think.

Advantages of underground cable laying with Nodig technology at a glance

  • Clever installation of protection pipes and power cables along roads and under traffic and waterways with short or long pipes made of all standard materials
  • Trenchless power cable routing for house connections from the pit/keyhole to the building or directly to the supply room and vice versa
  • Trouble-free realisation of the necessary installation depths for safe underground electric cable installation
  • Maximum planning and technical safety of underground cable laying according to the latest regulations
  • Precise proof and documentation of position, function and tightness of the new earth cables
  • Recognised by environmental associations as sustainable techniques with verifiably low consumption of nature capital

New pipe installation

Parallel bores

Method:
HDD horizontal directional drilling
Bore length:
Max. 500 m
Pipe diameter:
Up to 710 mm (pipe bundles) for single conductors up to 250 mm
Pipe materials:
PE, steel
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDODRILL - FLUID-ASSISTED HDD RIGS
Find out more

Crossings underneath traffic and waterways

Method:
HDD horizontal directional drilling
Bore length:
Max. 500 m
Pipe diameter:
Up to 710 mm (pipe bundles) for single conductors up to 250 mm
Pipe materials:
PE, steel
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDODRILL - FLUID-ASSISTED HDD RIGS
Find out more

Crossings underneath traffic and waterways

Method:
HDD horizontal directional drilling
Bore length:
Max. 100 m
Pipe diameter:
32–160 mm
Pipe materials:
PE, steel
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDOPIT - Mini fluid-assisted HDD rigs
Find out more

Crossings underneath traffic ways

Method:
Non-steerable soil displacement method
Bore length:
Max. 25 m
Pipe diameter:
Up to 160 mm
Pipe materials:
PE, PP, PVC (short and long pipes)
Soil classes:
1–5, displaceable soils
Our suitable NODIG-System for your application:
GRUNDOMAT - Soil displacement hammers
Find out more

House connection technology

PIT TO PIT

Method:
Guided rod pusher
Bore length:
Max. 25 m
Pipe diameter:
Up to100 mm
Pipe materials:
PE, PP, PVC (short and long pipes), PA12
Soil classes:
1-5, displaceable soils
Our suitable NODIG-System for your application:
-
Find out more

Pit–Basement

Method:
HDD horizontal directional drilling
Bore length:
Max. 100 m
Pipe diameter:
32–160 mm
Pipe materials:
PE, steel
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDOPIT - Mini fluid-assisted HDD rigs
Find out more

Pit to Pit

Method:
HDD horizontal directional drilling
Bore length:
Max. 100 m
Pipe diameter:
32–160 mm
Pipe materials:
PE, steel
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDOPIT - Mini fluid-assisted HDD rigs
Find out more

Keyhole–Basement

Method:
HDD horizontal directional drilling
Bore length:
Max. 60 m
Pipe diameter:
Up to 90 mm
Pipe materials:
PE (short and long pipes)
Soil classes:
1–5
Our suitable NODIG-System for your application:
GRUNDOPIT - Mini fluid-assisted HDD rigs
Find out more

Pit to Pit

Method:
Non-steerable soil displacement method
Bore length:
Max. 25 m
Pipe diameter:
Up to 160 mm
Pipe materials:
PE, PP, PVC (short and long pipes)
Soil classes:
1–5, displaceable soils
Our suitable NODIG-System for your application:
GRUNDOMAT - Soil displacement hammers
Find out more

Basement–Pit

Method:
HDD horizontal directional drilling
Bore length:
Max. 100 m
Pipe diameter:
32–160 mm
Pipe materials:
PE, steel
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDOPIT - Mini fluid-assisted HDD rigs
Find out more

Basement–Pit

Method:
Non-steerable soil displacement method
Bore length:
Max. 25 m
Pipe diameter:
Up to 160 mm
Pipe materials:
PE, PP, PVC (short and long pipes)
Soil classes:
1–5, displaceable soils
Our suitable NODIG-System for your application:
GRUNDOMAT - Soil displacement hammers
Find out more

DO YOU HAVE ANY QUESTIONS?

WE WILL BE GLAD TO HELP YOU!

You can reach us by phone

Call

 

E-Mail
Contact

Do you have any product or
services related questions?

Please contact us:

+61 7 3420 5455

SEND E-MAIL
Advanced Trenchless Technology