X

PROFESSIONAL construction of
gas distribution networks

Fast and cost-efficient installation of underground gas pipes with Nodig technology

Well developed natural gas distribution networks play an important role in the success of the energy turnaround. In order for thegas transmission network to be able to transport and store sufficient quantities of fossil and increasingly renewable natural gas, high investments are required for maintaining and expanding the gas grid. Using trenchless technologies these expenses can be significantly reduced in an environmentally friendly way. Moreover, expansion can be accelerated without compromising supply quality and security.

Safe underground gas pipe laying

Underground gas pipe laying and even renewal with NODIG technology and even renewal means maximum safety according to the latest latest technical standards. This goes for any type of gas pipeline
  • Pipelines for feeding the natural gas produced worldwide into national gas networks
  • Construction of gas distribution networks with pressure lines for transport and distribution
  • Underground gas pipes for the storage of synthetic gas from surplus green electricity 
  • Gas service connections

Underground gas piping at A GLANCE

  • Gas piping along roads and under traffic and waterways, with short or long pipes made of all standard materials
  • Trenchless construction of underground gas pipes for service connections from the pit/keyhole to the building or directly into the supply room and vice versa
  • The minimally invasive keyhole technology has been developed especially for the serial installation and renewal of gas house connections. It really couldn‘t be more gentle and economical
  • Trenchless renewal of damaged gas pipelines and house connections by replacement with new pipes in the existing route (pipe bursting) for sustained leak prevention while simultaneously adapting the gas pipe capacity by 1–2 nominal widths
  • Maximum planning and technical safety of the gas piping while maintaining the latest regulations
  • Precise proof and documentation of position, function and tightness of the new underground gas pipes

New pipe installation

Parallel bores

Method:
HDD horizontal directional drilling
Bore length:
Max. 500 m
Pipe diameter:
32–710 mm
Pipe materials:
PE, steel (media or protection pipes), PA12
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDODRILL - FLUID-ASSISTED HDD RIGS
Find out more

Crossings underneath traffic and waterways

Method:
HDD horizontal directional drilling
Bore length:
Max. 500 m
Pipe diameter:
63–710 mm
Pipe materials:
PE, steel (media or protection pipes), PA12
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDODRILL - FLUID-ASSISTED HDD RIGS
Find out more

Crossings underneath traffic and waterways

Method:
HDD horizontal directional drilling
Bore length:
Max. 100 m
Pipe diameter:
32–160 mm
Pipe materials:
PE, steel (media or protection pipes), PA12
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDOPIT - Mini fluid-assisted HDD rigs
Find out more

Crossings underneath traffic ways

Method:
Non-steerable soil displacement method
Bore length:
Max. 25 m
Pipe diameter:
Up to 160 mm
Pipe materials:
PE, PP, PVC (short and long pipes), PA12
Soil classes:
1–5, displaceable soils
Our suitable NODIG-System for your application:
GRUNDOMAT - Soil displacement hammers
Find out more

House connection technology

Pit to Pit

Method:
HDD horizontal directional drilling
Bore length:
Max. 100 m
Pipe diameter:
32–160 mm
Pipe materials:
PE (protection pipes), single pipes and pipe bundles, PA12
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDOPIT - Mini fluid-assisted HDD rigs
Find out more

Pit–Basement

Method:
HDD horizontal directional drilling
Bore length:
Max. 100 m
Pipe diameter:
32–160 mm
Pipe materials:
PE (protection pipes), single pipes and pipe bundles, PA12
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDOPIT - Mini fluid-assisted HDD rigs
Find out more

Keyhole–Basement

Method:
HDD horizontal directional drilling
Bore length:
Max. 60 m
Pipe diameter:
Up to 90 mm
Pipe materials:
PE (short and long pipes), PA12
Soil classes:
1–5
Our suitable NODIG-System for your application:
GRUNDOPIT - Mini fluid-assisted HDD rigs
Find out more

Pit to Pit

Method:
Non-steerable soil displacement method
Bore length:
Max. 25 m
Pipe diameter:
Up to 160 mm
Pipe materials:
PE, PP, PVC (short and long pipes), PA12
Soil classes:
1–5, displaceable soils
Our suitable NODIG-System for your application:
GRUNDOMAT - Soil displacement hammers
Find out more

Basement–Pit

Method:
HDD horizontal directional drilling
Bore length:
Max. 100 m
Pipe diameter:
32–160 mm
Pipe materials:
PE (protection pipes), single pipes and pipe bundles, PA12
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDOPIT - Mini fluid-assisted HDD rigs
Find out more

Basement–Pit

Method:
Non-steerable soil displacement method
Bore length:
Max. 25 m
Pipe diameter:
Up to 160 mm
Pipe materials:
PE, PP, PVC (short and long pipes), PA12
Soil classes:
1–5, displaceable soils
Our suitable NODIG-System for your application:
GRUNDOMAT - Soil displacement hammers
Find out more

Pit to Pit

Method:
Guided rod pusher
Bore length:
Max. 25 m
Pipe diameter:
Up to 100 mm
Pipe materials:
PE, PP, PVC (short and long pipes), PA12
Soil classes:
1-5, displaceable soils
Our suitable NODIG-System for your application:
GRUNDOSTEER PS130 -
Find out more

Pipe renewal

Renewal of natural gas pipelines

Method:
Dynamic pipe bursting
Bore length:
Max. 300 m
Pipe diameter:
Up to 508 mm
Pipe materials old pipe:
Steel, glass fibre reinforced plastics (GRP), PA12
Pipe materials new pipe:
Steel, PE/PP, PVC, PA12
Soil classes:
Old pipes passable for winch rope
Our suitable NODIG-System for your application:
GRUNDOCRACK - Dynamic pipe bursting systems
Find out more

Installation of pipes with smaller, equal or larger diameter

Method:
Static pipe bursting
Bore length:
Max. 300 m
Pipe diameter:
50–1,200 mm
Pipe materials old pipe:
Steel, glass fibre reinforced plastics (GRP), PA12
Pipe materials new pipe:
Steel, PE/PP, PVC, PA12
Soil classes:
Old pipes passable for bursting rods
Our suitable NODIG-System for your application:
GRUNDOBURST - Static pipe bursting systems
Find out more

DO YOU HAVE ANY QUESTIONS???
WE WILL BE GLAD TO HELP YOU!

CALL US!

+49 2723 808-0

WRITE TO US!

CONTACT FORM

Stay up to date

Subscribe to the Newsletter
Contact

Do you have any product or
services related questions?

Please contact us:

+49 2723 808-0

SEND E-MAIL
X

Privacy settings

We use cookies on our website. Some of them are essential to operate the website, while others help us analise the use of our website and improve our services. By clicking on "I accept" you agree to the processing of your data. You can use the "Individual cookie settings" button to refuse the use of cookies or to customise them at any time. You will find more detailed information in our data protection declaration.

Necessary
Statistics
Marketing
Accept all

Only accept necessary cookies
Individual cookie settings
Privacy statement | Legal notice

Privacy settings

X
Here you will find an overview of all cookies used. You can give your consent to the categories and display further information.
Accept all Back Store

Necessary>

Cookie
Description
Provider/
Storage-time
autokat
Cookie assist to provide the category for the download area.
TT
Session
autopg
Cookie assist to provide the product group for the download area

Session
autop
Cookie assist to provide the product for the download area

Session
tt_c_req
Consent to the use of necessary cookies. This figure can not be altered. If you don't store this figure, we can't allow you to access this page.

365 days
tt_c_stat
Consent or disapproval of cookies to create statistics

365 days
tt_c_marketing
Consent or disapproval of cookies for market analysis. Integrated Youtube-Videos can only be played with consent.

365 days
cftoken
This cookie is used to determine the type of device the guest is using, so that the website can be correctly formatted. This information is stored inside cookie "CFID".

10950 days
cfid
This cookie is applied in connection with the cookie "cftoken". The cookie stores a specific ID for the guest, as well as the device and browser of the guest.

10950 days
c_domIDPrefix
Cookie assist to store the chosen domain.

Session
c_domIDSuffix
Cookie assist to store the chosen domain.

Session
c_login
Cookie assist to store the login-data.

Session
cfglobals
Is defined by Adobe ColdFusion to identify the client device, so that the website-user-session variations can be stored.

10950 days
adseen
TT-advertising has already been displayed

Session

Statistics>

Cookie
Description
Provider/
Storage-time
_ga
Registers a unique ID, which is applied to generate statistical information, showing how the visitor uses the site.

365 days
_gat
Is applied by Google Analytics to restrict the requirement rate.

1 days
_gid
Registers a unique ID, which is applied to generate statistical information, showing how the visitor uses the site.

1 days

Marketing>

Cookie
Description
Provider/
Storage-time
ads/ga-audiences
Used by the Google Tag-Manager.

Session
gps
Registers a unique ID on mobile devices, to enable tracking based on the geographic GPS location.

1 days
ide
Applied by Google DoubleClick to register and report the users actions on the website after viewing or clicking on one of the providers ads, for the purpose of measuring the effectiveness of an advertisement and displaying targeted advertising to the user.

365 days
pref
Registers a unique ID, applied by Google to obstain statistics on how visitors use YouTube-Videos on various websites.

240 days
test_cookie
Used to check whether the visitors browser supports cookies.

1 days
VISITOR_INFO1_LIVE
Tries to estimate the user bandwidth on pages with integrated YouTube-Videos.

179 days
YSC
Registers a unique ID to keep statistics of YouTube videos, which the user has seen.

Session
yt-remote-cast-installed
Stores the user settings when retrieving a Youtube-Video integrated on other websites.

Session
yt-remote-connected-devices
Stores the user settings when retrieving a Youtube-Video integrated on other websites.

Persistent
yt-remote-device-id
Stores the user settings when retrieving a Youtube-Video integrated on other websites.

Persistent
yt-remote-fast-check-period
Stores the user settings when retrieving a Youtube-Video integrated on other websites.

Session
yt-remote-session-app
Stores the user settings when retrieving a Youtube-Video integrated on other websites.

Session
yt-remote-session-name
Stores the user settings when retrieving a Youtube-Video integrated on other websites.

Session
CTCNTNM_a8a9cd6e100ea022
Cookie from wireminds GmbH to analise visitor behaviour. This may involve the collection, processing and storage of data from which user profiles are created under a pseudonym.

90 days
track
Cookie from wireminds GmbH to analise visitor behaviour. This may involve the collection, processing and storage of data from which user profiles are created under a pseudonym.

Session
Advanced Trenchless Technology