X

Underground cable installation
the clever way of power cable routing

Laying earth cables without trenches practically works everywhere

Thebasic supply of electricity requires a dense and flexiblepower cable network. However, the high material and financial expenditure for laying cables using open trench methods often prevents the electricity from getting to where it is needed. The solution is the ecologically and economically gentle NODIG construction method. With trenchless technologies, underground cable routing is possible practically everywhere: in complex urban areas or across country, in protected areas or even underwater.

Laying underground cables is safe, simple and environmentally friendly

With our NODIG systems you can install the protection pipes for medium and high-voltage underground electric cables over long distances just as easily and environmentally friendly as the service lines to the end user, even directly into the supply room. By laying earth cables without trenches, you can even realise projects that would otherwise not be feasible for nature conservation reasons or because of concerned residents. Innovative NODIG technologies and proven standards make underground cable installation easier than you think.

Advantages of underground cable laying with Nodig technology at a glance

  • Clever installation of protection pipes and power cables along roads and under traffic and waterways with short or long pipes made of all standard materials
  • Trenchless power cable routing for house connections from the pit/keyhole to the building or directly to the supply room and vice versa
  • Trouble-free realisation of the necessary installation depths for safe underground electric cable installation
  • Maximum planning and technical safety of underground cable laying according to the latest regulations
  • Precise proof and documentation of position, function and tightness of the new earth cables
  • Recognised by environmental associations as sustainable techniques with verifiably low consumption of nature capital

New pipe installation

Parallel bores

Method:
HDD horizontal directional drilling
Bore length:
Max. 500 m
Pipe diameter:
Up to 710 mm (pipe bundles) for single conductors up to 250 mm
Pipe materials:
PE, steel
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDODRILL - FLUID-ASSISTED HDD RIGS
Find out more

Crossings underneath traffic and waterways

Method:
HDD horizontal directional drilling
Bore length:
Max. 500 m
Pipe diameter:
Up to 710 mm (pipe bundles) for single conductors up to 250 mm
Pipe materials:
PE, steel
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDODRILL - FLUID-ASSISTED HDD RIGS
Find out more

Crossings underneath traffic and waterways

Method:
HDD horizontal directional drilling
Bore length:
Max. 100 m
Pipe diameter:
32–160 mm
Pipe materials:
PE, steel
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDOPIT - Mini fluid-assisted HDD rigs
Find out more

Crossings underneath traffic ways

Method:
Non-steerable soil displacement method
Bore length:
Max. 25 m
Pipe diameter:
Up to 160 mm
Pipe materials:
PE, PP, PVC (short and long pipes)
Soil classes:
1–5, displaceable soils
Our suitable NODIG-System for your application:
GRUNDOMAT - Soil displacement hammers
Find out more

House connection technology

PIT TO PIT

Method:
Guided rod pusher
Bore length:
Max. 25 m
Pipe diameter:
Up to100 mm
Pipe materials:
PE, PP, PVC (short and long pipes), PA12
Soil classes:
1-5, displaceable soils
Our suitable NODIG-System for your application:
-
Find out more

Pit–Basement

Method:
HDD horizontal directional drilling
Bore length:
Max. 100 m
Pipe diameter:
32–160 mm
Pipe materials:
PE, steel
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDOPIT - Mini fluid-assisted HDD rigs
Find out more

Pit to Pit

Method:
HDD horizontal directional drilling
Bore length:
Max. 100 m
Pipe diameter:
32–160 mm
Pipe materials:
PE, steel
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDOPIT - Mini fluid-assisted HDD rigs
Find out more

Keyhole–Basement

Method:
HDD horizontal directional drilling
Bore length:
Max. 60 m
Pipe diameter:
Up to 90 mm
Pipe materials:
PE (short and long pipes)
Soil classes:
1–5
Our suitable NODIG-System for your application:
GRUNDOPIT - Mini fluid-assisted HDD rigs
Find out more

Pit to Pit

Method:
Non-steerable soil displacement method
Bore length:
Max. 25 m
Pipe diameter:
Up to 160 mm
Pipe materials:
PE, PP, PVC (short and long pipes)
Soil classes:
1–5, displaceable soils
Our suitable NODIG-System for your application:
GRUNDOMAT - Soil displacement hammers
Find out more

Basement–Pit

Method:
HDD horizontal directional drilling
Bore length:
Max. 100 m
Pipe diameter:
32–160 mm
Pipe materials:
PE, steel
Soil classes:
1–7, acc. to DIN 18324
Our suitable NODIG-System for your application:
GRUNDOPIT - Mini fluid-assisted HDD rigs
Find out more

Basement–Pit

Method:
Non-steerable soil displacement method
Bore length:
Max. 25 m
Pipe diameter:
Up to 160 mm
Pipe materials:
PE, PP, PVC (short and long pipes)
Soil classes:
1–5, displaceable soils
Our suitable NODIG-System for your application:
GRUNDOMAT - Soil displacement hammers
Find out more

DO YOU HAVE ANY QUESTIONS???
WE WILL BE GLAD TO HELP YOU!

CALL US!

+44 1234 342 566

WRITE TO US!

CONTACT FORM

Stay up to date

Subscribe to the Newsletter
Contact

Do you have any product or
services related questions?

Please contact us:

+44 (0)1234.342 566

SEND E-MAIL
X

Privacy settings

We use cookies on our website. Some of them are essential to operate the website, while others help us analise the use of our website and improve our services. By clicking on "I accept" you agree to the processing of your data. You can use the "Individual cookie settings" button to refuse the use of cookies or to customise them at any time. You will find more detailed information in our data protection declaration.

Necessary
Statistics
Marketing
Accept all

Only accept necessary cookies
Individual cookie settings
Privacy statement | Legal notice

Privacy settings

X
Here you will find an overview of all cookies used. You can give your consent to the categories and display further information.
Accept all Back Store

Necessary>

Cookie
Description
Provider/
Storage-time
autokat
Cookie assist to provide the category for the download area.
TT
Session
autopg
Cookie assist to provide the product group for the download area

Session
autop
Cookie assist to provide the product for the download area

Session
tt_c_req
Consent to the use of necessary cookies. This figure can not be altered. If you don't store this figure, we can't allow you to access this page.

365 days
tt_c_stat
Consent or disapproval of cookies to create statistics

365 days
tt_c_marketing
Consent or disapproval of cookies for market analysis. Integrated Youtube-Videos can only be played with consent.

365 days
cftoken
This cookie is used to determine the type of device the guest is using, so that the website can be correctly formatted. This information is stored inside cookie "CFID".

10950 days
cfid
This cookie is applied in connection with the cookie "cftoken". The cookie stores a specific ID for the guest, as well as the device and browser of the guest.

10950 days
c_domIDPrefix
Cookie assist to store the chosen domain.

Session
c_domIDSuffix
Cookie assist to store the chosen domain.

Session
c_login
Cookie assist to store the login-data.

Session
cfglobals
Is defined by Adobe ColdFusion to identify the client device, so that the website-user-session variations can be stored.

10950 days
adseen
TT-advertising has already been displayed

Session

Statistics>

Cookie
Description
Provider/
Storage-time
_ga
Registers a unique ID, which is applied to generate statistical information, showing how the visitor uses the site.

365 days
_gat
Is applied by Google Analytics to restrict the requirement rate.

1 days
_gid
Registers a unique ID, which is applied to generate statistical information, showing how the visitor uses the site.

1 days

Marketing>

Cookie
Description
Provider/
Storage-time
ads/ga-audiences
Used by the Google Tag-Manager.

Session
gps
Registers a unique ID on mobile devices, to enable tracking based on the geographic GPS location.

1 days
ide
Applied by Google DoubleClick to register and report the users actions on the website after viewing or clicking on one of the providers ads, for the purpose of measuring the effectiveness of an advertisement and displaying targeted advertising to the user.

365 days
pref
Registers a unique ID, applied by Google to obstain statistics on how visitors use YouTube-Videos on various websites.

240 days
test_cookie
Used to check whether the visitors browser supports cookies.

1 days
VISITOR_INFO1_LIVE
Tries to estimate the user bandwidth on pages with integrated YouTube-Videos.

179 days
YSC
Registers a unique ID to keep statistics of YouTube videos, which the user has seen.

Session
yt-remote-cast-installed
Stores the user settings when retrieving a Youtube-Video integrated on other websites.

Session
yt-remote-connected-devices
Stores the user settings when retrieving a Youtube-Video integrated on other websites.

Persistent
yt-remote-device-id
Stores the user settings when retrieving a Youtube-Video integrated on other websites.

Persistent
yt-remote-fast-check-period
Stores the user settings when retrieving a Youtube-Video integrated on other websites.

Session
yt-remote-session-app
Stores the user settings when retrieving a Youtube-Video integrated on other websites.

Session
yt-remote-session-name
Stores the user settings when retrieving a Youtube-Video integrated on other websites.

Session
CTCNTNM_a8a9cd6e100ea022
Cookie from wireminds GmbH to analise visitor behaviour. This may involve the collection, processing and storage of data from which user profiles are created under a pseudonym.

90 days
track
Cookie from wireminds GmbH to analise visitor behaviour. This may involve the collection, processing and storage of data from which user profiles are created under a pseudonym.

Session
Advanced Trenchless Technology